Can you provide an adequacy report?
Yes, where the existing works can be assessed with sufficient evidence. Opening-up, dimensions or supporting calculations may be required.
STRUCTURAL REPORTS
Concise structural reports for adequacy, observed defects, proposed works and lender or Building Control queries, written for the intended audience.
GUIDE FEE
TYPICAL PROGRAMME
Typically within 3 days of inspection
BEST FOR
Defined structural questions and formal records
WHAT THIS SERVICE DOES
A structural report is a formal written record of the engineer’s observations, assessment, assumptions, limitations and recommendations. Its scope is shaped around the decision it needs to support, rather than presenting a generic description of the property.
It may be required by a lender, buyer, Building Control reviewer, insurer or project team when verbal advice is not enough. A clearly framed report helps others understand what was inspected, what evidence exists and what further work may be needed.
The value is clarity that can be shared. The client can move forward knowing where the evidence is strong, where access was limited and what action is genuinely proportionate.

01
The inspection and report are framed around the decision, approval or record you need.
02
Findings and limitations are separated clearly from assumptions and recommendations.
03
Further investigation, remedial design or monitoring is stated only where it is proportionate.
BEHIND THE FINISHES
Structural engineering is largely about understanding the elements a finished home will conceal. These are the decisions that protect safety, comfort, approvals and the cost of changing course later.
01
Measurements, photographs, patterns and contextual information supporting the conclusion.
02
Areas concealed by finishes that must be recorded as limitations rather than assumed.
03
Whether monitoring or historic information is needed before movement can be classified.
04
The exact question asked by a lender, authority, buyer or project team.
01 Share the address, proposed works and any drawings or photographs.
02 We confirm scope, fee, information needed and whether a visit is appropriate.
03 Your engineer delivers the agreed information and supports reasonable review queries.
PLAN THE WHOLE PROJECT
Many projects need more than one isolated calculation or visit. Explore the linked services below, or share the complete brief so the right scope can be confirmed once.
Gather the focused site evidence behind a professional opinion.
Explore this service
Review exposed work, defects or a defined construction stage.
Explore this service
Respond when an authority needs further structural evidence.
Explore this service
Submit the project information through the quote form for an engineer-reviewed scope and fixed-fee proposal.
Common questions
Yes, where the existing works can be assessed with sufficient evidence. Opening-up, dimensions or supporting calculations may be required.
Requirements vary. Send us the lender or surveyor wording before appointment so the scope can be confirmed.
The report includes observations, assessment, assumptions, limitations and clear recommendations based on the agreed scope.
Reports are typically issued within three days of the inspection, depending on the project scope.
Yes. Further investigation, monitoring or remedial design may be recommended where the available evidence requires it.